Reconstruction project of Guansong Boyan water intake hub in Mianzhu City, Jiangsu Province

The hub is of four types of gates, and the reconstruction project includes two new intake gates, two flushing gates and nine flood discharge gates, which are 132M downstream of the existing gate

More    +

Riverside hub of Qiputang tuojun regulation project

The construction of additional pump station belongs to large (2) type The bidding project includes: all civil works of additional pump station and compensation box culvert in Jiangbian junction project

More    +

Jiangbian pivotal project of Zhangjiagang City extension project of tuojun in zomatang

The hub is of four types of gates, and the reconstruction project includes two new intake gates, two flushing gates and nine flood discharge gates, which are 132M downstream of the existing gate

More    +

Zhenjiang approach channel water conservancy project

Zhenjiang city flood control backbone project, including one 40 m wide sluice, seven 20 m wide sluice and one 20 m wide ship lock

More    +

Civil construction and equipment installation of Jiangbian junction of Xingou River extension and dr

The Jiangbian junction project is a control building at the intersection of Xingou River and the Yangtze River, which is composed of four parts: the control gate, the pump station, the ship lock and the fishway

More    +

Wan Fu gate

The gate chamber has 65 holes in total, which is an open reinforced concrete structure with a net width of 6m for each hole and a total net width of 390m It is a large sluice and a class 2 hydraulic structure

More    +

Taizhou leading River Gaogang hub

The largest single hydraulic structure in the history of water conservancy construction in Jiangsu Province is a strategic project to develop "the east of Jiangsu Province on the sea "

More    +

Second line ship lock project of Taizhou Yinjiang River

The total length of Taizhou approach river is 2400km The second line lock project consists of lock hydraulic engineering, highway bridge engineering, upstream and downstream approach channel and bank protection engineering

More    +

Sanhe Sluice

The important control gate of the Huaihe River water channel of our side, the large sluice designed and constructed by ourselves in the early days of the people s Republic of China

More    +

Civil construction and equipment installation of Jietai station of the first phase of the east line

Jietai station is a large-scale (1) project, and the main buildings such as pump station body, sluice chamber, inlet and outlet wing walls are of class 1

More    +

Huai'an fourth station project of the first phase of the east line of the south to North Water Tran

The design water delivery flow of Huai an four station is 100m3s, the design flow of Xinhe East sluice is 150m3s, the total net width of sluice hole is 24m, divided into three holes, and the total length of sluice is 98m,

More    +

Hongze station of the first phase of the east line of the south to North Water Transfer Project

Hongze station project is one of the third cascade pumping stations in the first phase of the east line of South-to-North Water Transfer Project The engineering grade is grade I, and the scale of the pumping station is large (type I)

More    +

Sanhanhekou sluice project of Nanjing outer Qinhuai River Regulation Project

Cofferdam and temporary facilities, earthwork, foundation treatment, concrete engineering, masonry engineering, metal structure, electrical equipment installation and commissioning, etc

More    +

Jiangdu water conservancy project

Jiangdu water conservancy project: Jiangdu water conservancy project, the leading project of Jiangdu water diversion project, has been completed for 17 years since the early 1960s

More    +

Huai'an water conservancy project

Located at the intersection of Beijing Hangzhou Grand Canal and Subei irrigation canal, it has 4 large-scale pumping stations, 1 power station, and more than 30 hydraulic structures such as sluice and bridge Our company was in 1970s-1990s

More    +